Forum quick links
SSc 3.3 Parking Availbility
posted by Jaclyn Noga on
There is no parking space available around the building, will that be satisfied for Exemplary Performance under the Version 3 rating system?
IEQc7.1, MET and CLO, and Acceptable Alterations
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Adam Kingsbury on
I am completing documentation for a dormitory that has a Summer/Winter operative temperature of 75/70, respectively.
CASE 2 and EAP2 Cumpliance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by João Gaio on
Hi, We are working on a multi tenant enclosed mall with aproximmatly 120.000, to be certified LEED 2009 EBOM. In Portfolio Manager, "enclosed mall" is not eligible to receive EnergyStar score.
CLO level adjustments
NC-v4 EQc5:Thermal comfortposted by Adam Kingsbury on
I am struggling to make spaces with a low metabolic rate (1.2 or below) comply with ASHRAE 55 at the current temperature setpoints (75 summer, 70 winter - air speed is 40 FPM and RH is 55%). I can
Donated Furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by richard heflin on
Myself and two other students are trying to document and submit MRc3.2 for a health clinic that has roughly 90% donated used furniture.
Proprietary Ingredients
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Elizabeth Felder on
Hello, the herbicide used at one of our properties consists of 98% proprietary ingredients. If the manufacturer will not provide a breakdown, would we be disqualified for this credit?
Correct invoice structure for millwork
NC-2009 MRc7:Certified Woodposted by Susan Di Giulio on
Hi there, I have been having a heck of a time getting correct and complete millwork invoices even from FSC certified shops, who really ought to know.
Exemplary performance?
posted by Erica Downs on
The Reference Guide says "this credit is not eligible for exemplary performance...." However, the LEED Online Form (form v4) has a line item for "SS Credit 2: Development Density and Community Con
L-6 Project Sections/ Elevations
CI-2009 PIf4:Schedule and Overview Documentsposted by Jaclyn Noga on
I am unsure what to upload for L-6 "Provide project section(s)/elevation(s)." I asked our architect and he said that he did not really do that for our project because we are just doing the interio
Greenguard certification?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Erin Holdenried on
We are specifying a wood floor with HDF core, it is Greenguard certified. Does Greenguard certified meet the requirements of this credit?