Forum quick links
FIre station modeling
NC-2009 EAp2:Minimum Energy Performanceposted by David Hahn on
I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.
Large footage residence and threshold adjustment
posted by LEED Pro Consultant on
Hello. We are in the very first steps in our first LEED Home.
Regional- Additives Taken into Consideration?
CS-2009 MRc5:Regional Materialsposted by Roberto Meza on
I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp
CS MPR2: reclaimed land without development previously
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Vivien Wong on
Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement
IAQ Option #1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by David Biggs on
For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage.
Appealing WEp1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Anu Sumanth on
We have a small two story core and shell project. The owner provided rough ins for plumbing fixtures to be installed by the tenant.
Bus Stops for Exemplary Performance
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Yuran Pan on
There are around 10 bus stops that are within 1/4 mile walking distance from the building main entrance (Some of the bus stops only have one bus line).
TI in a LEED certified Core & Shell Building
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Hammett on
Hello. I am currently working on a tenant improvement project located within a building that was previously LEED certified under the Core & Shell rating system.
selecting controller efficiency manufacturer company
NC-2009 WEc1:Water Efficient Landscapingposted by prerana tuladhar on
how to select the controller effciency manufacturer company? which company is the best and supplies worldwide??
Shared parking deck
posted by Celia Heneghan on
We have a campus being constructed with 5 expected buildings and 1 parking deck to serve all. All buildings and deck will be individually metered. We are planning a campus approach.