Fan power calculations
CS-2009 EAp2:Minimum Energy Performanceposted by Eleni Soulti on
Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4
NAF (GLUE) LETTER
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by jack larson on
I have a letter from the manufacturer stating that the laminating adhesive that will be used in the fabrication of the doors contains no added formaldehyde. (NAF).
LEED v4 Required Standards list
posted by Andres Schwarz on
Do you know where I can get a list of all the required standards in LEED v4 in a single unifed list? I am looking for the ones we most work with- i.e. ASHRAE 90.1, 62.1, etc.
Forniture in IEQc8.1 option 1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by FABIO VIERO on
Dear all, I'm now working on a project (office building, new construction) under LEED NC v2009 Certification.
Flow Restrictors
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Malek Abualhaj on
Hello, we have non compliant faucets and showerheads, therefore, we are going to install flow restrictors. Would we need to test them at 60 and 80 psi?
Packaging products
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Gabriel Frasson on
I was wondering if some packaging of products that adress IEQ requirements but also attend one or more MRc1 criteria can be used here, like soap packing. Other question is, shampoo and/or band-aid
Preliminary earthworks before project registration
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Amanda Johnson on
Hello, For complicated planning reasons on a large (probably Campus) project some preliminary earthmovement and demolition will take place soon, but the project is not yet registered.
Design vs. Construction Review
posted by Christopher Strunk on
General Question: If a project is submitting their LEED information in the two part Design and Construction approach, do all the of credits which are noted as being "Design" credits have to actual
LEED Membership Statistics Tool
posted by Spencer Kim on
Is there any tool or program available to see the number of LEED Associates and AP Specialists worldwide?
Offsite restoration for greenfield developments
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marni Punt on
Could anyone confirm if the case 2 addenda (11/3/2010) could be relevant to Greenfield developments as well? What would the documentation that must be submitted be?