Exemplary Performance

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  William Holub  on 

Looking for some group input both on the sustainability 'value' and insight in to suitability for exemplary performance for an idea being kicked around. We have an airport facility project that ca

1
Fri Jul 25, 2014, 5:02 am

Raised Access Floors (specialist)

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Akos Brandecker  on 

Hi All, My understanding is that raised access floors (RAF) don’t fall under IEQc4.3 as it is the finish material that needs to comply (as highlighted by Susann and Lauren in an earlier thread). H

1
Sat Jul 26, 2014, 3:32 pm

Baseline Building Performance

Schools-2009 EAp2:Minimum Energy Performance
posted by  Justin Weisser  on 

In an all-electric building with a Geothermal Bore field and packaged Heat Pumps system, if the project wants to use an Indirect Gas fired Make-Up Air Unit for the Kitchen Exhaust Hood, will we hav

1
Thu Jun 19, 2014, 6:37 pm

Split System Heat Pumps with Heat Recovery Ventilators

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nancy Henderson  on 

We are working on a residential building that has common areas which are conditioned with split system heat pumps and heat recovery ventilators for fresh air.

1
Mon Jun 30, 2014, 3:24 pm

Using a variety of waste recycling resources may be necessary

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Joanna Switzer  on 

Just completed a renovation of an older Armory structure that resulted in demolished site paving along with a mix of demo'd interior materials along with the more typical construction debris.

0

Final review appeal for credit EAc1, new energy model

General forums
posted by  Veronica Reed  on 

Hello We just received the final review report and despite being awarded 31 credits in all categories besides Energy and Atmosphere, we were denied certification since our energy modeling and resu

0

How to define categories

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Noriko Nagazumi  on 

Hello there, There is a sample summary of energy and metering capacity on page 200 of the reference guide, and some explanation on "Energy Use Breakdown" on page 198 saying that significant appli

1
Mon Jan 25, 2016, 9:46 pm

Parallel PIU fan energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Magda Aghababyan  on 

My baseline is under system 6 in which the parallel PIU fans has to be introduced for each zones.

1
Fri Jun 20, 2014, 2:39 pm

View perserving automated shades

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Edwin van Eeckhoven  on 

Dear All, What is exactly the definition of "automated" with regard to the shades when using option 2 for this credit, and would manually operated electric blinds be compliant when VLT x WFR >

1
Fri Jun 20, 2014, 11:48 am

Submitting Construction Phase Credits in Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Matthew Heaton  on 

When submitting our preliminary design review for a LEED for schools project, we did not submit any Construction Phase Credits. Was this an error?

1
Tue Jun 24, 2014, 5:23 am