Forum quick links
Exemplary Performance
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by William Holub on
Looking for some group input both on the sustainability 'value' and insight in to suitability for exemplary performance for an idea being kicked around. We have an airport facility project that ca
Raised Access Floors (specialist)
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Akos Brandecker on
Hi All, My understanding is that raised access floors (RAF) don’t fall under IEQc4.3 as it is the finish material that needs to comply (as highlighted by Susann and Lauren in an earlier thread). H
Baseline Building Performance
Schools-2009 EAp2:Minimum Energy Performanceposted by Justin Weisser on
In an all-electric building with a Geothermal Bore field and packaged Heat Pumps system, if the project wants to use an Indirect Gas fired Make-Up Air Unit for the Kitchen Exhaust Hood, will we hav
Split System Heat Pumps with Heat Recovery Ventilators
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nancy Henderson on
We are working on a residential building that has common areas which are conditioned with split system heat pumps and heat recovery ventilators for fresh air.
Using a variety of waste recycling resources may be necessary
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Joanna Switzer on
Just completed a renovation of an older Armory structure that resulted in demolished site paving along with a mix of demo'd interior materials along with the more typical construction debris.
Final review appeal for credit EAc1, new energy model
posted by Veronica Reed on
Hello We just received the final review report and despite being awarded 31 credits in all categories besides Energy and Atmosphere, we were denied certification since our energy modeling and resu
How to define categories
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Noriko Nagazumi on
Hello there, There is a sample summary of energy and metering capacity on page 200 of the reference guide, and some explanation on "Energy Use Breakdown" on page 198 saying that significant appli
Parallel PIU fan energy
NC-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
My baseline is under system 6 in which the parallel PIU fans has to be introduced for each zones.
View perserving automated shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Edwin van Eeckhoven on
Dear All, What is exactly the definition of "automated" with regard to the shades when using option 2 for this credit, and would manually operated electric blinds be compliant when VLT x WFR >
Submitting Construction Phase Credits in Design Review
posted by Matthew Heaton on
When submitting our preliminary design review for a LEED for schools project, we did not submit any Construction Phase Credits. Was this an error?