Forum quick links
trying to understand the effort
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ramana Koti on
Hello. We're trying to decide if pursuing energy modeling under Option 2's Path 1 would be worth the effort.
Plf4 - upload L-4 & Plf4-3
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
What is specifically meant with " mechanical plans and / or drawings " for L-4 ? I think it is definitely floor plan layout but what about details ? Is the details sheet also needed ?
Submit For Review
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Does "submit For Review" tab under "Design Preliminary Review" ( LEED online - timeline ) allow me to review the credits that I am planning to submit one more time before I submit it OR does it
Can 1 of 4 buildings on one site pursue LEED for Homes Midrise?
posted by Katrina Morgan on
Proposing on a project that has four buildings. 3 buildings are 100% residential. 1 building is mixed-use with 25% retail + office, and 75% residential.
presence sensors
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In a building that I’m going to model presence sensors are installed in all the internal spaces. It is an education center.
Whole building LCA - embodied and operational impacts
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Henrique Mendonca on
Let’s suppose a building is designed to use a material that although it has high embodied energy (concrete), it will improve the operational thermal performance due to thermal mass and the overall
Water Teatment Plant
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Alejandro Alfaro on
Option 2 of this credit requieres to treat 50% of wastewater on-site to tertiary standards.
Testing for Residential
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Donald Green on
I have read the threads for this credit as well as any LI that I could find to determine the amount of testing locations required.
ACP Regional Materials Calculator
CI-2009 MRc5:Regional Materialsposted by Charles Nepps on
I found a draft copy of "ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S." from 2011.
Core and Shell Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Gustav Alfaro on
Hi, we are trying to certify a core and shell office building which has an electrical meter for the common areas and independent meters for the tenants, but we don't have access to the electricity