LEED Online V3 and web browser solutions?
posted by Allison Zuchman on
Revisiting an old issue, but perhaps updates have been made since I last checked....
Vending machines
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Andres Giraldo on
Hi, I am wondering if this credit can be earned when the facility have some vending machines which provide beverages and snacks for the employees, but the company doesn't provide any other kind of
Recycling rooms to suit tenant fitout needs
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Larry Jones on
We are working on an office CS project which is being built to suit for a single tenant.
Rainwater capture artificial retention pond
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by John Covello on
Hello, We are looking to use rainwater capture to provide for our site's sanitation and irrigation needs. There is no potable water actually available for the site currently from local sources.
Project Registration Required
posted by Lewis Hewton on
Is there a way to review the new system without officially registering a new project (and completing the certification agreement)?
All sanitary installations will only be built at tenant fit-out
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mark Frey on
We are working on the LEED Core&Shell (v3, 2009) project in Switzerland .
Water heating equipment efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Renato Sandoval on
As a non-us consultant I always have a problem attending the EA.P2 requirement.
Brand New - Raw space
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Ruben Garza on
If Ihave a project that is going into a brand new development where the tenant space simply has open stud exterior walls and storefront and no slab or ceilings (only exposed podium concrete deck)..
VAV minimum flow set points
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, Appendix G3.1.3.13 says "Minimum volume setpoints for VAV reheat boxes shall be 2.15 L/s·m2 of floor area served or the minimum ventilation rate, whichever is larger" When you have a HVAC sys
Energy & Atmosphere
NC-2009 EAp2:Minimum Energy Performanceposted by GOVINDACHARI SUNDARARAJAN on
I am appearing for LEED GA Exam on June-9th 2014, i need a clarification as below, in this website in EA and in each of the credit like EA: Pre requisite-2: Min Energy Performance There are option