Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Building Reuse off Site

Schools-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Larry Turbes  on 

Our project has two building structures that will be moved for use on another property by a different owner. One is a greenhouse, the other is a prefabricated temporary classroom building.

1
Thu Apr 17, 2014, 5:11 pm

EP Threshold for LEED-HC

NC-2009 EAc6:Green power
posted by  Paul Diaz  on 

The reference guide does not provide an EP threshold for this credit under the LEED-HC system. Does anyone know if an EP point is available at 70% or 100%?

1
Mon May 19, 2014, 6:58 pm

Illustrating Compliance using representative sampling?

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Ryan Hoffman  on 

All, We are working with a client in a 1.2 mill. SF office building with three towers connected by a central core.

1
Mon Aug 10, 2015, 6:48 pm

LEED CS with partially occupied building

LEED Rating System Selection
posted by  alessandro speccher  on 

hello everybody, this is my first post on leeduser and I want to start giving compliments to everybody are sharing so lot of knoweledge; returning to building, a design team described me this conte

1
Wed Nov 5, 2014, 12:58 pm

Greenhouse Program

Schools-2009 IDc1:Innovation in Design
posted by  Larry Turbes  on 

The elementary school we're working on will have a greenhouse for growing primarily food products, with the aim of teaching students where food comes from and what the associated environmental/heal

1
Tue Mar 17, 2015, 5:13 pm

LEEDuser IPM template updated

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Tristan Roberts  on 

LEEDuser has updated our IPM template that is available to members in the Documentation Toolkit above.

1
Thu Dec 11, 2014, 12:04 am

EP credit

EBOM-2009 IEQc2.4:Daylight and Views
posted by  ethan adams  on 

What will be the minimum % of views to qualify for exemplary performance when version 4 begins?

1
Sat Jul 26, 2014, 12:33 pm

LEED Project boundary and adjacent road.

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Lawrence Lile  on 

We are building a LEED project next to an existing road. It is a gravel road owned by the same entity that owns the LEED project, and they also own the property across the road.

1
Tue Jun 17, 2014, 9:51 pm

2 different system in LEED Boundary

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SW LEE  on 

Hi, In our project, we have 2 different ventilation system.

0

Rainwater

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  FABIO VIERO  on 

Hi, I'm now working on a project under LEED certification according to NC v2009. We collect rainwater to provide non-potable water to wc. May we consider this water in WEp1 and WEc3 calculation?

1
Tue Apr 22, 2014, 11:18 am