We have rat issues on our urban campus and our grounds staff has some concerns about limiting and slowing application of rodent pesticides in exterior use.
Acceptable Forms of Universal Notification?
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by American University on
We have rat issues on our urban campus and our grounds staff has some concerns about limiting and slowing application of rodent pesticides in exterior use.
Modified Prerequisite
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Markus. We are planing to use LEED-CS Revised points thresholds based in Owner Energy percentage.
Contract between the Owner and the CxA
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Mohamed M. Abd Elhameed on
For pursuing EAc3, the contract between the owner and the CxA ensuring CxA involvement in post-construction shall be uploaded through LEED Online credit form.
number of working days
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Emmanuel Pauwels on
We are surveying building occupants which consist of 2 groups. Group A of the building occupants works 5 days per week. Group B has a 6 day workweek.
Material SRI
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Mohamed Hesham on
i'm participating in a LEED ebom project where the construction was completed in 1990 , the roof tiles are white terrazzo tiles but we can't get any data or documentation from the manufacturer , is
Floor Coatings
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Guillermo Hernandez Espinoza on
Hello. It is necessary to document the floor coatings in the IEQc4.3?
Natural ventilation of interior rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ritwik Kakati on
We have a multifamily building where the naturally ventilated kitchens are interior rooms, located next to the living/dining rooms that have operable windows.
Open Space Offset
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Gabriela Crespo on
Dear Forum, We are working on a project where the open space is very limited.
group certification - exclude an existing building
posted by FABIO VIERO on
We are investigating if group certification approach may be suitable for a project that include within the same LEED boundary the following buildings: - n1 Existing Building (Energy House) that wa