Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

previous documents

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Brian Dougherty  on 

I am working to get the EBOM SSc6 v2009 credit. The building has already received the credit for NC v2.2 SSc6.1 and SSc6.2. I have the documentation for the previous version and credits. 1.

1
Thu Dec 11, 2014, 5:46 pm

HVAC Design Case Equivalent of VRF systems

NC-2009 EAc1:Optimize Energy Performance
posted by  Achelles DSouza  on 

I am working in an Office block project (conditioned area- 8500 sqft). VRF systems have been considered for it.

1
Sun Mar 16, 2014, 8:04 pm

Printers in open space

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike D  on 

If a project space does have printer areas in the open plan office but those printers/copiers are low-use, are there any additional details we need to provide or should we just mention these printe

1
Thu May 15, 2014, 5:24 pm

Precertification

General forums
posted by  IOANNIS LADOPOULOS  on 

good morning, I would like to ask a question with two sections. If a CS project has been precertified as platinum in a previous rating system (ie Version 2.0 ) : a) Can the final certification be

1
Wed Mar 26, 2014, 10:17 pm

Split review - extend deadline?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Tim Habraken  on 

Dear all, A quick question: I am working on a C&S project - aiming at a split review (construction phase & design phase).

1
Mon Mar 17, 2014, 9:27 pm

Achieving this credit in a Shopping mall?

CS-2009 IEQc6:Controllability of Systems—Thermal Comfort
posted by  Maya Karkour  on 

Dear Sirs, We have a mall seeking LEED C&S 2009. Most of the spaces will be tenanted.

1
Tue Sep 20, 2016, 4:12 pm

LEED v4 Healthcare - outpatient facility

General forums
posted by  Sabrina B  on 

I am working on a project that is an OUTPATIENT free standing emergency department. It is not a HOSPITAL.

1
Wed Mar 19, 2014, 10:05 pm

Community Connectivity travel distance

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Jennifer Rennick  on 

I am documenting basic services within a 1/2 mile radius of a project, however within the radius is a large body of water (river port).

0

Employee Garden for IO Point?

EBOM-2009 IOc1:Innovation in Operations
posted by  LUCY WILLIAMS  on 

Hi All, Has anyone had success crafting an innovation credit around an employee garden? We have a portion of our site dedicated to an organic employee garden.

1
Wed Apr 30, 2014, 3:14 pm

Partial Existing Envelope

NC-2009 EAc1:Optimize Energy Performance
posted by  Clint Whitney  on 

I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.

1
Mon Mar 17, 2014, 9:18 pm