Forum quick links
previous documents
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Brian Dougherty on
I am working to get the EBOM SSc6 v2009 credit. The building has already received the credit for NC v2.2 SSc6.1 and SSc6.2. I have the documentation for the previous version and credits. 1.
HVAC Design Case Equivalent of VRF systems
NC-2009 EAc1:Optimize Energy Performanceposted by Achelles DSouza on
I am working in an Office block project (conditioned area- 8500 sqft). VRF systems have been considered for it.
Printers in open space
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
If a project space does have printer areas in the open plan office but those printers/copiers are low-use, are there any additional details we need to provide or should we just mention these printe
Precertification
posted by IOANNIS LADOPOULOS on
good morning, I would like to ask a question with two sections. If a CS project has been precertified as platinum in a previous rating system (ie Version 2.0 ) : a) Can the final certification be
Split review - extend deadline?
posted by Tim Habraken on
Dear all, A quick question: I am working on a C&S project - aiming at a split review (construction phase & design phase).
Achieving this credit in a Shopping mall?
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We have a mall seeking LEED C&S 2009. Most of the spaces will be tenanted.
LEED v4 Healthcare - outpatient facility
posted by Sabrina B on
I am working on a project that is an OUTPATIENT free standing emergency department. It is not a HOSPITAL.
Community Connectivity travel distance
NC-2009 SSc2:Development Density and Community Connectivityposted by Jennifer Rennick on
I am documenting basic services within a 1/2 mile radius of a project, however within the radius is a large body of water (river port).
Employee Garden for IO Point?
EBOM-2009 IOc1:Innovation in Operationsposted by LUCY WILLIAMS on
Hi All, Has anyone had success crafting an innovation credit around an employee garden? We have a portion of our site dedicated to an organic employee garden.
Partial Existing Envelope
NC-2009 EAc1:Optimize Energy Performanceposted by Clint Whitney on
I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.