Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pre-occupancy Cleaning

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Maggie Pipek  on 

If you are not pursuing a green cleaning credit, is there anywhere in the credits (IEQc3.1/IEQc3.2 Construction IAQ Management Plan or elsewhere) that dictate requirements for post-construction/pre

1
Mon Mar 3, 2014, 4:38 pm

Loading Docks

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Michael McPheron  on 

Our project consists of a manufacturing facility with 3 loading docks. These docks do not currently have an entryway system.

1
Thu Mar 6, 2014, 3:34 pm

The RPCs have been updated

General forums
posted by  Jean Marais  on 

Hi chaps, the international RPCs have been updated. http://www.usgbc.org/rpc/LEED-NC/v2009/

0

Support an Existing Farm

Pilot-Credits SSpc82:Local food production
posted by  Tess Doeffinger  on 

In order for a school to meet Option 3: Supporting a local Farm, does there have to be both a financial contribution and volunteering involved or can it just be one of them?

1
Tue Apr 8, 2014, 1:30 pm

Pilot credit "Walkable Project Sites" double-dips with SSc2?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  GTF CPRE  on 

Our campus student union is considering an Innovation Credit using v4 pilot credit 14: Walkable Project Sites.

1
Thu Mar 6, 2014, 4:00 pm

Acetone Based Dye Stains

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rebecca Bryant  on 

I read the string of comments on acetone being used as a floor stripper in polished concrete applications.

1
Sat Mar 8, 2014, 3:15 am

Audit Documentation

EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Program
posted by  Trevor Gilbert  on 

I am working on an office building that is 16 floors with each floor approximately 18,000 sf.

1
Mon Nov 30, 2015, 8:53 pm

Daylighting in ECB Method

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

I know that I can take credit for automatic daylighting controls under the Performance Rating Method of Appendix G.

1
Tue Mar 4, 2014, 2:53 pm

Rubber Grating

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Charline SEYTIER  on 

There's been discussions about rubber mats but we are dealing with a question concerning rubber grating that will come with a non-slip metal frame. Per our understanding, being grates, no weekly m

1
Tue Mar 4, 2014, 5:57 pm

Breaks, Holidays, and PTO

NC-2009 PIf3:Occupant and Usage Data
posted by  Jamison Hill  on 

Hey LEEDUsers, How should we account for lunch break, paid holidays, and annual leave/PTO in our FTE calculations? 1.

1
Fri Mar 7, 2014, 3:53 pm