Forum quick links
Pre-occupancy Cleaning
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Maggie Pipek on
If you are not pursuing a green cleaning credit, is there anywhere in the credits (IEQc3.1/IEQc3.2 Construction IAQ Management Plan or elsewhere) that dictate requirements for post-construction/pre
Loading Docks
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Michael McPheron on
Our project consists of a manufacturing facility with 3 loading docks. These docks do not currently have an entryway system.
The RPCs have been updated
posted by Jean Marais on
Hi chaps, the international RPCs have been updated. http://www.usgbc.org/rpc/LEED-NC/v2009/
Support an Existing Farm
Pilot-Credits SSpc82:Local food productionposted by Tess Doeffinger on
In order for a school to meet Option 3: Supporting a local Farm, does there have to be both a financial contribution and volunteering involved or can it just be one of them?
Pilot credit "Walkable Project Sites" double-dips with SSc2?
NC-2009 SSc2:Development Density and Community Connectivityposted by GTF CPRE on
Our campus student union is considering an Innovation Credit using v4 pilot credit 14: Walkable Project Sites.
Acetone Based Dye Stains
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rebecca Bryant on
I read the string of comments on acetone being used as a floor stripper in polished concrete applications.
Audit Documentation
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by Trevor Gilbert on
I am working on an office building that is 16 floors with each floor approximately 18,000 sf.
Daylighting in ECB Method
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Benson on
I know that I can take credit for automatic daylighting controls under the Performance Rating Method of Appendix G.
Rubber Grating
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Charline SEYTIER on
There's been discussions about rubber mats but we are dealing with a question concerning rubber grating that will come with a non-slip metal frame. Per our understanding, being grates, no weekly m
Breaks, Holidays, and PTO
NC-2009 PIf3:Occupant and Usage Dataposted by Jamison Hill on
Hey LEEDUsers, How should we account for lunch break, paid holidays, and annual leave/PTO in our FTE calculations? 1.