Forum quick links
Documentation for Existing Certified Projects on Campus
posted by Caroline O'Leary on
I'm working on documenting a project on a community college campus. The Owner does not have the documentation from the previous project which was LEED certified.
site area
EBOM-2009 PIf2:Project Summary Detailsposted by Andres Giraldo on
Hi, our project is classify as Industrial-manufacturing facility.
Is the bottom of the basin allowed in Open Space Calculations?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Candice Rogers on
Hello - We have two landscaped detention basins on our site. Their slopes are vegetated, but exceed the 1:4 ratio.
Historical Buildings with Protected Facades
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Jean Marais on
We are faced with the question of whether it is feasable to attempt a LEED ND certification on a German neibourhood which houses 100% historical buildings with protected facades.
EAC1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Maria Isabel Conde on
We have a project in a leed certified building. I want to know if the UA calculation only requires use the project areas or all the building areas. And we need to submit the product cut sheets?
LEED V3 or V4 for LEED CS project
CS-2009 PIf1:Minimum Program Requirementsposted by Jin Yang on
Hi Kemberly, I'm planning to register a LEED CS project in China that needs precertification as soon as possible.
School bus stops
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Farah A. on
If a project is located within 1/4 mile of two school bus lines, will it earn the credit? Or must one of the lines be public? Thanks!
50 foot setback
NC-2009 SSc1:Site Selectionposted by Farah A. on
Do ponds need to meet the 50 ft setback? I understand small man made ponds for recreational, fire supression or stormwater retention purposes are exempt from this setback. Anyone know if these ar
Mix Use Development
posted by Patrick Lee on
I am working on a project with equal floor space distribution of apartments, hotel and offices. It will consist of 2 towers and shared underground carparking facility. The owner will lease the hote
Single Zone served by 2 HVAC systems
CI-2009 IEQp1:Minimum IAQ Performanceposted by Nandana Kumar on
Hi, In our project, a particular zone (Board Room) is being served by 2 systems: central chiller plant through an AHU & by Cassette Units.