Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Stone counter adhesive/filler - problem with VOCs

Homes-v2008 MRc2:Environmentally preferable products
posted by  Melanie Loftus  on 

I'm running into a problem on more than one LEED-H project. There is a product, Superior Knife Grade, that is used as adhesive and filler in stone counters.

1
Mon Dec 23, 2013, 8:22 pm

Project boundary for addition and major renovation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  kelly ryan  on 

I am Working on a project with a 2 story addition. A portion of the project includes a major renovation to the building entry. My question lies with where to define the project boundary.

1
Mon Oct 21, 2013, 11:27 pm

FTE and Peak Transients for Luxury Commercial Centre

Calculating FTEs
posted by  Ian McCall  on 

I am working on certifying a High-high end Luxury Commercial Centre. 80-90% of the clientele are rich foreigners and their purchases are very high-end luxury products.

1
Tue Oct 8, 2013, 12:35 pm

Form Release Spray VOC limit

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Crissy Tsai  on 

Under Rule 1113; June 3, 2011 Architectural Coatings: Form Release Compounds have a current limit of 250 g/L and then 1/1/14 it drops to 100 g/L.

1
Tue Oct 8, 2013, 11:23 am

SSc4.1 School Documentation Map

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Armen Isagholi  on 

I submitted for this credit and received the comments back with a pending designation...I am complying with Option 1 - Bus Rapid Transit station but they want to see a revised site drawing showing

1
Mon Oct 21, 2013, 11:52 pm

Must the space for the Systems 9 and 10 be heated?

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.

1
Wed Oct 9, 2013, 7:34 pm

the fan power of Systems 9 and 10

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).

1
Wed Oct 9, 2013, 8:53 pm

SSc4.3 SSc4.4.

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Marco Antonio  on 

Hello friends! I am following the certification of an institutional building where we were given the credits and SSc4.3 SSc4.4. Occurred to acquire more land for parking garage where we use and we

1
Mon Nov 4, 2013, 6:15 pm

SS9.1 area seating requirements

Healthcare-v2009 SSc9.1:Connection to the natural world - places of respite
posted by  Perkins and Will  on 

In our healtchare project, we have many areas that are designated as places of respite for visitors and staff that vary in size based on square footage.

1
Thu Oct 10, 2013, 9:49 pm

Total Peak occupancy filled in Plf 3 AND the one used in IEQ P1

NC-2009 PIf3:Occupant and Usage Data
posted by  Tam Kin Hung  on 

I am working on a LEED EB project, the Total Peak occupancy filled in Plf 3 is clear, however, but just wonder how this number can also maintain reasonable in IEQ P1 in order to calculate the Popul

1
Thu Nov 7, 2013, 9:29 pm