Stone counter adhesive/filler - problem with VOCs
Homes-v2008 MRc2:Environmentally preferable productsposted by Melanie Loftus on
I'm running into a problem on more than one LEED-H project. There is a product, Superior Knife Grade, that is used as adhesive and filler in stone counters.
Project boundary for addition and major renovation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kelly ryan on
I am Working on a project with a 2 story addition. A portion of the project includes a major renovation to the building entry. My question lies with where to define the project boundary.
FTE and Peak Transients for Luxury Commercial Centre
posted by Ian McCall on
I am working on certifying a High-high end Luxury Commercial Centre. 80-90% of the clientele are rich foreigners and their purchases are very high-end luxury products.
Form Release Spray VOC limit
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Crissy Tsai on
Under Rule 1113; June 3, 2011 Architectural Coatings: Form Release Compounds have a current limit of 250 g/L and then 1/1/14 it drops to 100 g/L.
SSc4.1 School Documentation Map
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Armen Isagholi on
I submitted for this credit and received the comments back with a pending designation...I am complying with Option 1 - Bus Rapid Transit station but they want to see a revised site drawing showing
Must the space for the Systems 9 and 10 be heated?
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.
the fan power of Systems 9 and 10
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).
SSc4.3 SSc4.4.
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Marco Antonio on
Hello friends! I am following the certification of an institutional building where we were given the credits and SSc4.3 SSc4.4. Occurred to acquire more land for parking garage where we use and we
SS9.1 area seating requirements
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Perkins and Will on
In our healtchare project, we have many areas that are designated as places of respite for visitors and staff that vary in size based on square footage.
Total Peak occupancy filled in Plf 3 AND the one used in IEQ P1
NC-2009 PIf3:Occupant and Usage Dataposted by Tam Kin Hung on
I am working on a LEED EB project, the Total Peak occupancy filled in Plf 3 is clear, however, but just wonder how this number can also maintain reasonable in IEQ P1 in order to calculate the Popul