Forum quick links
Scorecard
NC-2009 PIf1:Minimum Program Requirementsposted by John Riker on
We are trying to finish submitting all our credits, and I can't get the check mark for PI-1 on the scorecard to turn green.
SS2 Landscaping Irrigation and WE2 Irrigation System
posted by Bill Kehres on
How do you get credits for no irrigation? I do not see any automatic points or a way to calculate them.
Re-using shale and theater seating
NC-2009 MRc3:Materials Reuseposted by Michelle Meis on
I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.
DHW Model Inputs
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
All, We are attempting to accurately model the gas energy usage for the DHW system in a recent residential building.
Floor Area
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Simon Sue on
In pursuit of flush out for the project, should "gross floor area" be used or "net occupiable area" for the calculations? The "FAQs for IEQc3.2" section on this page states "all occupied gross floo
Universal Design
Pilot-Credits PC34:Design for Adaptabilityposted by USGBC National Office (in DC) BG+LU FW on
This particular single family home was designed for adaptability by request of the client.
New Addition
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Jeff Potter on
Hi, We are designing a 36,000sf addition to a 55,000sf school. This school addition will be an extension of the existing school buildings wing.
Construction Documents Creation for Small Commercial Interiors
posted by Sylvia Washington on
I apologize in advance for the cross posting. This is my first LEED project as a LEED AP/Building Owner and I am running into an emerging war between the architect who is not LEED accredited and a
Daylight measurement requirements...
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Rick Alfandre on
I am not finding any parameters for the daylight measurement option as far as times of day or other issues.
20% Documentation Requirement
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Elliot Powers, LEED AP BD+C on
I cannot seem to find any language, either in the RG, LEED Online credit form, or in any prior discussions here that specifies how this 20% requirement applies.