Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy simulation software

NC-2009 EAc1:Optimize Energy Performance
posted by  Jakub Wiesner  on 

Hello, I have some experiences with energy modelling in eQuest, but I would like to change my software to something else.

1
Thu Sep 26, 2013, 3:00 pm

LEEDonline Troubleshooting: Images

General forums
posted by  Lauren Bellamy  on 

Does anyone have suggestions as to how to troubleshoot error messages in Internet Explorer 8 when trying to upload images? I've looked all over the forum and cannot find a resolution that works.

1
Thu Sep 26, 2013, 2:28 pm

process load categorization

NC-2009 EAp2:Minimum Energy Performance
posted by  Ramana Koti  on 

Greetings. This is more of a LEED for Retail question pertaining to modeling a commercial kitchen.

1
Thu Sep 26, 2013, 3:59 pm

minimum sq footage

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  said bandi  on 

what is the minimum square foot building to qualify for LEED certification for NC

1
Mon Sep 30, 2013, 8:39 pm

Activity Level for New LEED online forms

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Nelina Loiselle  on 

The new v. 4 forms table IEQc7.1-1. Space Design Parameters asks for the "Activity Level" to be listed per each space type. Are they asking for the MET rate?

1
Mon Nov 4, 2013, 1:02 am

Facility Transfer Average Recycling Rate

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Andy Rhoades  on 

I have heard rumors of GBCI allowing projects to use a facilities average diversion rate in liue of an actual project specific diversion rate, given it covers the projects performance period.

1
Tue Nov 5, 2013, 3:39 am

Blow-Out Fixture Guidance

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Simon Sue  on 

We work in SE Asia where many buildings have installed already or still install squat toilets (floor toilets) which are blow-out fixtures. In a recent review comment, we have been advised: "The fo

1
Sat Oct 12, 2013, 9:27 am

Project on 7th floor

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mike D  on 

If the LEED CI project is located on the 7th floor of a building, do we still need to provide non-smoking signs on the ground floor? There is no smoking allowed in the building following national l

0

LEED rating for a penthouse on top of an existing building

General forums
posted by  ruffina thilakaratne  on 

I am working on a new two storey penthouse project which is 2900sqft and located on the roof top of a low-rise existing gym and a car park building. the project is located in Asia.

1
Tue Nov 5, 2013, 6:51 pm

Life of lamp

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Tam Kin Hung  on 

Refer to the reference guide, the test condition of life of lamp is 3 hours on for every 20 minutes off for fluorescents, 11 hours on for high-intensity discharge lamps.

1
Fri Sep 27, 2013, 12:45 pm