Forum quick links
Carpet with GUT certification, what about caprolactam?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ward Miller on
We are working on a big box store in Europe striving to achieve this credit, but differences between the standard Green Label Plus and ACP approaches seems to be causing questions related specifica
Preferred Parking for employees or visitors?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by mary ostafi on
Our building has 2 main entrances, one in back where the employees park and one paid lot in front where visitors and general parking is located.
Questions regarding preliminary design review comments
posted by Shivani Langer on
If we have questions regarding GBCI reviewer comments that were sent to us after preliminary design review submission, can we just submit them when we submit for final design review, or those need
Electrical PVC Cement
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Landis Wilson on
My electrical contracting company is using PVC for underground applications(e.g. floorboxes). I assume that it should be characterized under the PVC welding VOC limits of 510g/L.
LEEDuser template updated
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Tristan Roberts on
For our members, LEEDuser has updated Section 9 of the Building Exterior and Hardscape Management Plan Template that we offer in our Documentation Toolkit above.
Base Building Ongoing LEED Certification
CI-2009 SSc1:Site Selectionposted by Nick Chiarelli on
The base building is currently undergoing construction and their LEED certification will not be ready for a couple months.
Floor Area for Daylight
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mark Garber on
Can the floor area under built-in casework composed of base cabinets and overhead cabinets be excluded from the floor area using the prescriptive option for sidelighting daylight calaculations for
Transient minimums or calculations for barracks
NC-2009 PIf3:Occupant and Usage Dataposted by Lew Bonadies on
Typically we submit 0 transients (visitors) for our Army barracks LEED NC projects. This has been challenged by the reviewer. Are there "minimums" expected for transients, even on an Army base?
cut stone floor
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Florinda Garcia on
The cut stone floor proposed for the project, will have a pore and non-slip treatment, with this treatment after the instalation in the project, has to comply with floorscore or is exempt and only
Unit of the NonPotable Water Usage
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Dear all, I'am using HVAC condensate water for landscape irrigation, with an average rate of 8 gpm, in need to know in what units should I document that?