Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

pre-rinse spray faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Sheryl Swartzle  on 

Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?

1
Wed Aug 14, 2013, 6:51 pm

Do you submit form during Design or Construction Review phase?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nicole Kimoto  on 

For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?

1
Wed Aug 14, 2013, 9:11 pm

PIf2: square footage of all parking areas

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

Does anyone know if the 'square footage of all parking areas' includes the drives as well, or is it only the parking stalls themselves?

1
Wed Aug 14, 2013, 10:10 pm

LEED EBOM for Hydroelectric Power Plant?

LEED Rating System Selection
posted by  Silvia Ruiz  on 

Hi, My question is regarding the feasability of certifying a hydroelectric power plant facility under the LEED EBOM Rating System.

1
Mon Aug 19, 2013, 11:52 pm

Dual toilet flush rate average

CI-2009 WEc1:Water Use Reduction
posted by  Mike D  on 

If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c

1
Mon Aug 19, 2013, 3:51 pm

Room by room versus Apartment calculations

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Michael Wironen  on 

Our project is a 14-floor residential project. We are pursuing the prescriptive pathway for daylighting, which requires us to calculate the floor to window ratios for each room.

1
Thu Aug 15, 2013, 3:28 pm

SSc 6.1, 6.2, and SSpc16

Pilot-Credits SSpc16:Rainwater management
posted by  Hannah Sokol  on 

Just to confirm, this pilot credit can be pursued in addition to the current stormwater management credits SSc6.1 and 6.2, is that correct?

1
Tue Nov 5, 2013, 5:42 pm

Styrofoam glue

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Marina Andrade  on 

Dears, We have a project that have the LEED Gold target. We need earn IEQc4.1 and IEQc4.2 credits.

1
Thu Aug 15, 2013, 7:15 pm

Filtration tank unit system

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Lilian Seow  on 

The project is a on a zero-lot site. A mechanical pond - Filtration water system in place since excavation started.

1
Tue Sep 24, 2013, 1:39 pm

Calculation clarification-

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Sahar Abi-Ziki  on 

Our building has a large atrium on 3 floors. We are trying to achieve credit SSc2, option 1 development density.

1
Mon Aug 19, 2013, 9:08 pm