NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Sheryl Swartzle on
Working on my 1st project that includes a pre-rinse spray faucet for a restaurant/cafe type setting. What should should be shown as the total daily uses and the duration on the template?
Do you submit form during Design or Construction Review phase?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nicole Kimoto on
For the EAp1 form, I'm confused as to whether I am supposed to fill out this form for the design preliminary review, because this is a Construction credit? Can someone please clarify?
PIf2: square footage of all parking areas
NC-2009 PIf2:Project Summary Detailsposted by Michael Kros on
Does anyone know if the 'square footage of all parking areas' includes the drives as well, or is it only the parking stalls themselves?
LEED EBOM for Hydroelectric Power Plant?
posted by Silvia Ruiz on
Hi, My question is regarding the feasability of certifying a hydroelectric power plant facility under the LEED EBOM Rating System.
Dual toilet flush rate average
CI-2009 WEc1:Water Use Reductionposted by Mike D on
If we were to calculate the average flush rate of a dual flush toilet (with urinals present in the space) we use the example average flow rate equation provided by USGBC in their Appendix A water c
Room by room versus Apartment calculations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael Wironen on
Our project is a 14-floor residential project. We are pursuing the prescriptive pathway for daylighting, which requires us to calculate the floor to window ratios for each room.
SSc 6.1, 6.2, and SSpc16
Pilot-Credits SSpc16:Rainwater managementposted by Hannah Sokol on
Just to confirm, this pilot credit can be pursued in addition to the current stormwater management credits SSc6.1 and 6.2, is that correct?
Styrofoam glue
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Marina Andrade on
Dears, We have a project that have the LEED Gold target. We need earn IEQc4.1 and IEQc4.2 credits.
Filtration tank unit system
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Lilian Seow on
The project is a on a zero-lot site. A mechanical pond - Filtration water system in place since excavation started.
Calculation clarification-
NC-2009 SSc2:Development Density and Community Connectivityposted by Sahar Abi-Ziki on
Our building has a large atrium on 3 floors. We are trying to achieve credit SSc2, option 1 development density.