The project is a on a zero-lot site. A mechanical pond - Filtration water system in place since excavation started. The project is currently at above grade stage.At what stage can this system be unplugged? or What is the disconnection criteria? Everyone seems to be baffled by when this system needs to be removed from site and how does the removal impact the erosion and sedimentation plan ?