Building Exterior Cleaners
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Erin Holdenried on
We have a project with a stone/concrete/brick cleaner that is only used approximately every 15 years. It is biodegradable, low VOC, etc. However, it does not have GS or CCD certification.
I have a LEED-NC 2009 hotel
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susan Di Giulio on
I have a LEED-NC 2009 hotel project and I am testing various fixtures in the WEp1 template.
Industrial Flooring - Concrete Waterproofing / Sealer
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Catherine Blakemore on
I have an industrial flooring product that is a 3-part system (primer, waterproof membrane and topcoat (which is solid gray). It would be installed on the concrete slab of a mechanical penthouse t
Building Foot Print
NC-2009 PIf3:Occupant and Usage Dataposted by Ahmed Mosa on
We are currently working in the design of an iconic building that has 2 layers of facade.
Submittal recomendation.
NC-2009 PIf3:Occupant and Usage Dataposted by Daniel Garavito on
We are currently close to finishing all credit requirements. Do you recomend to submitt al information for review as it is completed or wait to have all ready and submitting it all at once?
Discharge rates and run off
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Sean Hogan on
Hi, In simple terms, is there a difference between 'discharge rate' and 'run off'? We are currently assessing our site to determine which case and path to follow.
Electricity Monitoring
Pilot-Credits PC38:Advanced Utility Trackingposted by Angela Loughry on
Would the intent of the credit be satisfied if only electric end uses were monitored - say plug loads, lighting loads, mechanical loads, and one appliance to get our four loads.
Manufacturer information on SRI not available
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Magda Aghababyan on
I was looking for manufacturer data sheets to confirm the SRI for Zn-Al coated roofing (Silver color) but in Sri Lanka the suppliers do not have that information available. Can you please tell me
Mixed strategy, windows and mechanical ventilation?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Lise Dannesboe on
If I understand the intent of the credit correctly, we have to provide individual controls for every second FTE in individual spaces or open-plan offices.
Scheduled pest management not a good strategy?
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Magda Aghababyan on
Is scheduled pest management activities (for example once a month) not an appropriate strategy under this credit?