Forum quick links
Gross Floor Area, Mechanical Space
NC-2009 PIf2:Project Summary Detailsposted by Gary Ashford on
ASHRAE is not specific about deducting for floor openings. For cost estimating and code review, we normally deduct elevator shafts and stairwells.
Non-potable water sources
NC-2009 WEc1:Water Efficient Landscapingposted by Inés Alomar on
We are participating in the certification of a building in the Europe Square in L’Hospitalet, Barcelona. The Europe Square area was previously and industrial area.
ID for Green Walls
NC-2009 IDc1:Innovation in Designposted by Maya Karkour on
Hello, We are consulting on a large shopping mall and the Client will be covering one of the building facades with vegetation (roughly 25% of the vertical walls area will be covered). Do you thin
Peak Demand...hourly, daily, weekly, monthly
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Common sense tells me they are not interested in by the second peak energy demands for each end user...so to ask the stupid question: Which average value should I output here...hourly average annua
Update of the energy modelling for the construction review
CS-2009 EAc1:Optimize Energy Performanceposted by Juliette Barach on
Hi, I'm currently working on a LEED CS office building, and can't find a clear answer to my question in the LEED referential, user's guidance or standard: Do I need to update the energy modellin
Lines of sight depth cutoff
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Matthew Macko on
Is there a requirement for the depth of lines of sight to exterior glazing to be compliant with this credit?
FSC Wood Delivery Limits for Chain of Custody
NC-2009 MRc7:Certified Woodposted by Jennifer Kissinger on
I have a tradesman telling me that he can only make four deliveries to the jobsite for FSC certified materials in order to be compliant with chain of custody. Is this correct?
EVSE requirement
Pilot-Credits LTpc70:Green vehiclesposted by Yoyo Shek on
As in the requirement, EVSE must be networked and internet addressable and be capable to encourage off-peak charging.
PIF1 Review Comment Pre-Certification
NC-2009 PIf1:Minimum Program Requirementsposted by Markus Henning on
We recive the following review comment in a pre certification on one of our CS projects.
Question about the results in Performance Period
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ron Dean on
There is a possibility that in the 12 months of the Performance Period, during the first six months not obtained satisfactory results provided the measures and strategies to achieve the minimum sco