As in the requirement, EVSE must be networked and internet addressable and be capable to encourage off-peak charging. However, the team proposed to physical locked the charger by property management and the charger will be unlocked if there is a demand. If the charging is performed during off-peak, a discount will be provided. Does the approach meet the requirement mentioned above? Thanks.