Regular building occupants at research institution
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Eddie Cuevas on
I am working on a project at a research university. We are seeking to obtain certification for a building on campus that consists of research, classroom, and office spaces.
Does anyone out there know
Schools-2009 EAp2:Minimum Energy Performanceposted by Ema S on
Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum
EAp2
Schools-2009 EAp2:Minimum Energy Performanceposted by Ema S on
Does anyone out there know what the following comment pertains to: Provide additional information (Mech-5C report) to verify that the Proposed Case Carrier units have been modeled at a 50% minimum
Refrigerations system
Retail-NC-v2009 EAp2:Minimum energy performanceposted by Matteo Rigo on
Do the refrigeration system such as walk-in coolers or refrigeration cases must be detailed modeled in the simulation program (E+)? or is it possible consider them as a process loads?
Plan Template?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Melissa Wrolstad on
Is there an M+V plan template for this credit? There is a template for the M+V 5.1 credit. Thanks, Melissa
WE Fixture Group simple question
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rick Alfandre on
I apologize for the simplicity of my question, but I want to make sure I am providing accurate information. If I have a commercial office building with 2 identical unisex bathrooms with no urinals
Exclude retail?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Mike D on
Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.
Renewable Energy Cost - Escalating Rate
NC-2009 EAc2:On-Site Renewable Energyposted by Timothy Casper on
Our project has a PV array which is leased by the building owner under a 20-year power purchase agreement. However, the agreed upon rate increases 2% each year during these 20 years.
Owner's LEED Projects Database- does anyone have it?
posted by Ludmilla Pavlova-Gillham on
Are you an owner or owner's repsentative and do you have a database of LEED documentation for your projects? I work in higher-education and we have a goold to build at the LEED Silver or higher lev
Parking spaces under a bridge
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Martin Vaclavik on
The parking area of our project is mostly located underground but there are some parking spaces on the ground level. Based on our calculation we can meet credit Option 2 requirements.