Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Selecting baseline for mixed use building

NC-2009 EAp2:Minimum Energy Performance
posted by  Lavanya Veerappa  on 

We are working on a project which is mixed use facility (6 storey/G+5) . The first & 2nd floor is used for office & remaining for residential.

1
Sat Jun 1, 2013, 2:48 pm

EA 5,1

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Muhammad Faisal Azizullah Jaffar  on 

We are working on a mall project going ahead with the LEED CS GOLD.We are currently on tender stage and the client has suddently come up with the LEED requirement.

1
Sun Jun 2, 2013, 2:57 pm

Case 2 Calculator - Space Types

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Timothy Casper  on 

Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).

1
Thu Jun 27, 2013, 2:07 pm

Projects outside the U.S.

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Stefanie Hoffmann  on 

Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t

1
Fri Jun 21, 2013, 1:26 am

Projects outside the U.S.

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Stefanie Hoffmann  on 

Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t

0

Temporary carpets / rugs

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Maya Karkour  on 

Hello, Do roll-out carpets / rugs usually used in residential apartments need to be certified?

1
Mon Jun 3, 2013, 5:30 pm

Planned Transfer Center

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Josh Mauldin  on 

My project is a fire station that is the first project on the site of a mixed use development. A bus transfer center is planned to be built directly across from the fire station.

0

Section 1.4: Mechanical System Design Criteria

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Nick Chiarelli  on 

If I could get some clarification on this section it would be a huge help! Total project space load (heating and cooling): Is this the sum of all seperate max space loads or is this the load of th

0

Crawl space included in GSF? Interior courtyards?

NC-2009 PIf2:Project Summary Details
posted by  Michael Wironen  on 

We have a fairly complicated building project that includes two areas that are unclear to me as to whether they should be included in the gross floor area calculation: 1.

1
Thu Jun 6, 2013, 5:38 pm

Serving all occupants

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jennifer Benedict  on 

I am building a new tower right next to an old tower, connected by an existing parking garage. Our LEED boundary is just the new construction.

1
Fri Jul 12, 2013, 8:37 pm