HCFC123 or HFC410A

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  edward deschapell  on 

On a new construction project which is the better way to go when installing a new chiller? A chiller with HCFC or HFC? Thanks

1
Mon Nov 4, 2013, 2:14 am

Parking space separate problem

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Nan ZHANG  on 

Dear all, Our project is a synthesized building with office, shopping mall and residence. Only the part of the office will apply for the LEED certification.

1
Thu Sep 19, 2013, 7:45 am

Within Boundary-Consider only 1 service&shud be open to public?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Muna Akheel  on 

“For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public.” 1. Does this mean that only 1 service

1
Fri May 24, 2013, 3:41 pm

infill site

ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodies
posted by  Cardy V  on 

Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?

0

LEED Project Boundary for a Train Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michael G  on 

Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati

1
Tue Nov 5, 2013, 4:43 pm

When to submit for construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jon Quigley  on 

Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?

1
Tue May 28, 2013, 12:31 pm

Airflow Monitoring Devices Specifications

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ahmed Younis  on 

Does the (airflow sensor) need to have any specifications other than the required accuracy (which is 15%) which was mentioned in the study guide?

1
Mon May 27, 2013, 4:25 pm

water use reduction calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  Jamal Uddin  on 

How to calculate the baseline building performance with compare to my building performance in water use reduction?

1
Mon Aug 19, 2013, 6:29 pm

LEED Project Boundary of vertical attached building

NC-2009 PIf2:Project Summary Details
posted by  Nan ZHANG  on 

Dear all, I'm working on a vertical attached building project.

1
Fri May 31, 2013, 8:44 pm

Denied Design Credits

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Karim Farid  on 

If a Design credit was denied in the Final Design review, can I resubmit it with the Construction credit after addind the missing information

1
Mon May 27, 2013, 7:00 pm