NC-2009 EAp3:Fundamental Refrigerant Managementposted by edward deschapell on
On a new construction project which is the better way to go when installing a new chiller? A chiller with HCFC or HFC? Thanks
Parking space separate problem
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nan ZHANG on
Dear all, Our project is a synthesized building with office, shopping mall and residence. Only the part of the office will apply for the LEED certification.
Within Boundary-Consider only 1 service&shud be open to public?
NC-2009 SSc2:Development Density and Community Connectivityposted by Muna Akheel on
“For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public.” 1. Does this mean that only 1 service
infill site
ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Cardy V on
Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?
LEED Project Boundary for a Train Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael G on
Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati
When to submit for construction Review
posted by Jon Quigley on
Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?
Airflow Monitoring Devices Specifications
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ahmed Younis on
Does the (airflow sensor) need to have any specifications other than the required accuracy (which is 15%) which was mentioned in the study guide?
water use reduction calculation
NC-2009 WEc1:Water Efficient Landscapingposted by Jamal Uddin on
How to calculate the baseline building performance with compare to my building performance in water use reduction?
LEED Project Boundary of vertical attached building
NC-2009 PIf2:Project Summary Detailsposted by Nan ZHANG on
Dear all, I'm working on a vertical attached building project.
Denied Design Credits
posted by Karim Farid on
If a Design credit was denied in the Final Design review, can I resubmit it with the Construction credit after addind the missing information