Vandal-resistant aerator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marc Mondor on
Hello, We just got our review back for a new construction of an office building. For this credit we had a comment from the reviewer, that we have never encounter before.
NC-v2.2 certified project - How to certify a large new addition
posted by Michelle Bombeck on
We have a NCv2.2 certified building that is now constructing an addition. This addition was planned years ago and was registered as an NCv2.2 project but was then put on hold.
LEED for Homes
CI-2009 SSc1:Site Selectionposted by Ryan McEvoy on
We have a project that is moving into a building that has been certified under LEED for Homes Mid-Rise. Can the project still pursue option 1?
STC for Ceiling Assembly
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by PREMNATH SUNDHARAM on
I'm filling out the Table IEQc9-1 and it asks me for a STC rating for the ceiling assembly. I set the space "adjacent to assembly" to "outdoors " because it is only a 1-story building.
Tenant/Owner Do Not Purchase Food for Occupants...So I Did.
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Michelle Bracewell-Musson on
I have wriiten verification the Tenant (State Office) and Owner do not make food purchases (none for tea/coffee either), therefore, I bought my own UDA Certified Organic and had a the LEED Charrett
Separate Buildings, Same Cellar
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jesus Deras on
I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar.
LEED Signage for display inside Gold certified office building
posted by Jeff Zunt on
I'm looking for great examples of sign packages that were developed and displayed in buildings that identify the LEED credits achieved throughout the building and how they were achieved.
LEED Project Boundary in case of uderground parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mario Pinoli on
Hello, just a question about LEED Project Boundary.
Feed-in tariffs
CS-2009 EAp2:Minimum Energy Performanceposted by BH . on
Hi, Hi, in EU most countries have feed-in-tarriffs, which reimburse the owner for energy produced at a higher rate than the cost of energy.
Ongoing Cx Requirements
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Colleen Collins on
I have a question regarding EA2.3 As I understand it, it appears that the ongoing Cx process effectively begins with EAc2.1 and EAc2.2.