I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar. As per reference guide sizing guideline, do I have to provide two individual centralized locations (275 SF minimum each) to meet credit intent, or can I provide one (500 SF) room to meet the prerequisite requirement for both projects?