Cx and contractors

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jean-Baptiste Noel  on 

Hi all, Our current project is a Design & Build, for which the MEP contractors are required to hire a third party to commission their systems (so each MEP will probably have a different compan

1
Tue Apr 2, 2013, 2:24 pm

Exterior Corridor

NC-2009 PIf3:Occupant and Usage Data
posted by  Ema S  on 

We are working on a school building, the second floor contains an exterior corridor that cotains roof overhang.

1
Thu Mar 28, 2013, 8:16 pm

LPD for data center space type

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Keith Amann  on 

I received comments back from a reviewer that data center/server rooms should be classified as "active storage" with 0.8 W/sf allowance.

1
Mon Nov 4, 2013, 11:15 pm

PIf4 Overview Documents Uploading

NC-2009 PIf4:Schedule and Overview Documents
posted by  Giancarlo Perossa  on 

Someone else posted the following (which I'm having trouble with, as well) elsewhere on leeduser: "I’m not sure I am successfully uploading pdf files on PIf4 at “Overview Documents”.

1
Thu Apr 4, 2013, 2:28 pm

Existing Transit

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Amanda Tullos  on 

Can someone please clarify, for infill projects under 125 acres with existing transit, does the project require access to multiple transit types? The credit language seems to request this.

1
Wed Mar 27, 2013, 2:40 pm

Responsible party for preparing M&V plan

NC-2009 EAc5:Measurement and Verification
posted by  Becky Dix  on 

What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?

1
Wed Apr 10, 2013, 2:34 pm

Can LEED interpretations be enforced on older LEED versions?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sandra Bauder  on 

It is my understanding, that though one can choose to quote a CIR for equal treatment under a specific credit, CIR's do not constitute a formal part of a credit requirement. Specifically, we are pu

1
Wed Mar 27, 2013, 7:46 pm

Controller efficiency factor (CE)

NC-2009 WEc1:Water Efficient Landscaping
posted by  Ricardo Sá  on 

During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).

0

ND standard vs the NC standard

ND-v2009 GIBp4:Construction activity pollution prevention
posted by  Amanda Tullos  on 

Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th

1
Thu Mar 28, 2013, 3:01 pm

Radical Simplification

General forums
posted by  Melissa Wrolstad  on 

MR credits need to be radically simplified. Below is an example simplification: "Combine MRcr2, MRc3 and MRcr4 into one credit.

0