Forum quick links
Cistern volume
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Lucie Cervena on
Could you please give me an advice regarding question 1?
USGBC Approved Program - ?
posted by Peggy White on
I've just begun my review of the newly revised MR Credits, and I keep seeing the following as a potential path for achieving some of these Credits: "USGBC approved program: Products that comply wit
EPA guidelines applicable to KSA
NC-2009 SSp1:Construction Activity Pollution Preventionposted by BABAR MEHMOOD on
We are working on a project in city riyadh of Saudi Arabia.There are no local codes available for the site.
Shaded parking required for preffered parking?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by BABAR MEHMOOD on
We are working on an outpatient clinicproject in Riyadh, we have provided preffered parking near to main entrance, is it mandatory to have preffered parking covered with shade structure and should
Occupant Density - Filling out the IEQp1 form
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
Hello, I have two specific questions, please help me working them out. 1.
Refrigerant Gas AB-22- Compliance
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Marina Andrade on
Hi, Does anyone knows if the Refrigerant Gas AB-22-A comply with the CFC´s - EBOM requirements? Is there any Leed adenda in order to confirm this? Thanks in advance.
What's the surprise new MR option in LEED v4 all about?
posted by Tristan Roberts on
I posted an article in its own LEEDuser forum going into more depth on what MRc4 Option 3 is all about.
Exterior window shades controllability
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by April Eisenhauer on
To meet this requirement: "In private rooms, provide occupant controls that are readily accessible from the patient bed for exterior window shades, blinds, and/or curtains" Does this mean for all
Three Different Kitchen Sinks
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Eric Webber on
If our project has three different kitchen sinks with varying flow rates (ie SK-1: 1.0GPM, SK-2: 1.5GPM etc), how do I enter the usage for the FTE in the project?
Strategy/ Methodology to divert concrete waste from Landfill
NC-2009 MRc2:Construction Waste Managementposted by Mohd Imran Shaikh on
We are currently aiming to achieve this credit on a project by providing on site infrastructure to separate waste and divert from landfill.