Weekly Reading Requirement for Option 1 AND Option 2?
EBOM-2009 WEc1:Water Performance Measurementposted by Michelle Bracewell-Musson on
Hi All, It looks like our team missed something and I want to be sure.
Green guide applicable to thos credit at all?
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Helena Larsson on
Hi all Does anyone know if Green guide is applicable to credit IEQc4.3 at all.
Whose invoice is necesary?
CS-2009 MRc5:Regional Materialsposted by Michael E. Edmonds-Bauer on
We have a situation with a contractor and a manufacturer. There is one manufacturer of steel bars in Mexico. This manufacturer is selling steel bars to our "soil stabilization contractor". Becau
Rainwater collection (kGal) calculations for LEED
NC-2009 WEc3:Water Use Reductionposted by Ameet AA on
Is there a calculator tool or methodology that we should use when submitting our annual rainwater collection (kGal) calculations for LEED? Our calculations are currently based on BS 8525 Rainwater
LEED NC 2009 - EAc5 - M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?
ID Credit?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by John-David Hutchison, LEED AP BD+C, PMP on
Has anyone successfully utilized this EB:OM credit as an ID credit for NC or CI?
LEED EB O&M project
posted by Razan Nejem on
I have an existing building that is mainly an 9000 m2 office building.
Darkrooms LPD Space by Space Method
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We have a darkroom in a facility but Im not sure if it should be classified as active, inactive storage or other type of classification for the space by space method.
How to Determine and Overall M&V Accuracy
NC-2009 EAc5:Measurement and Verificationposted by Margaret McColl on
IPMVP Vol III requires the M&V Plan to include the "expected overall M&V accuracy" (pg 9) and in Section 4.5.9 Option D: Uncertainty it refers to ASHRAE Guideline 14 for guidance.
Do I need to document out of scope HVAC equipment?
CI-2009 EAp2:Minimum Energy Performanceposted by Silvia Ruiz on
Hi, Given that only the portions of the building as covered by the tenant’s scope of work need to comply with ANSI/ASHRAE/IESNA Standard 90.1–2007, do we need to document those that are out of the