Forum quick links
Pesticides are not stored or mixed on the building
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Ruba Al-Foraih on
We have a contractor that will chemically prepare and store our pesticides in his offices.
How to document Squat Toilet/Hole Toilet?
CI-2009 WEc1:Water Use Reductionposted by Derek Fung on
Currently, I'm working on a CI project in China. The project locates on 19th floor, which shared by two tenants.
fillers and epoxies
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Eri Spaulding on
Does anybody know what are these products can be categorized as under the VOC limits table? -Heavy Duty Block & Concrete Filler. -Protective & Marine coatings: Water based catalyzed epoxy.
applicability of the project
CI-2009 IEQc7.2:Thermal Comfort—Verificationposted by michele diab on
I have read that hotels are elligible for credit IEQ 7.2. If the hotel is composed of branded residences (with a basic kitchen without all equipments) and traditional rooms for the hotel, is it sti
3% of the total vehicle parking capacity for a complex
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by MT A on
When calculating “3% of the total vehicle parking capacity of the site” as per LEED NC 2009 SSc4.3 Option 1, can we use the total parking capacity associated only with our project program and assoc
Sustainable Food policy
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Lee Ann Walling, LEED AP ND on
Hi we are a state agency and usually aren't able (by law) to provide food for ourselves with taxpayer funds, nor do we have a cafeteria.
minimum outdoor air
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
Minimum outdoor air shall be model identically in both the cases. I am confused which outdoor air should be taken from either from IEQ baseline or from actual.
Shared parking facilities
Pilot-Credits LTpc70:Green vehiclesposted by Maria García on
Im not sure if in this pilot credit applies that the parking facility is not part of the LEED project construction scope.
I am relatively new to LEED
NC-2009 EAp2:Minimum Energy Performanceposted by le sang on
I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process loa
Vacant Space Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Calloway on
I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.