Appeal for denied credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Johnathan Woodside on May 4, 2015, 3:01 pm

If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review. Upon returning comments from the second review, will the corrections made...

Last reply: Marcus Sheffer, Aug 15, 2019, 3:24 pm

LEED-NC and Interior Fitout

NC-2009 MPR2: Must be a complete, permanent building or space
posted by CT G on Jun 21, 2015, 2:46 pm

An owner is developing an office building which is to 75% occupied by one company (different from the owner developing the building). The rest of the building shall remain vacant until tenants...

Last reply: FABIO VIERO, Apr 8, 2021, 9:36 am

Solar PPAs and Calculating Annual Energy Cost Reductions

NC-v4 EAc2: Optimize Energy Performance
posted by Joshua Radoff on Aug 12, 2015, 5:00 pm

works. There was a thread in one of the other LEED User forums recently on this subject. Log in or register to post comments Joshua Radoff Renewable and Sustainable Energy Specialization Lead, MENV...

Last reply: Marcus Sheffer, May 10, 2019, 3:05 pm

Electrical Commissioning Scope

NC-v4 EAp1: Fundamental commissioning and verification
posted by Renee Azerbegi on Sep 24, 2015, 6:25 pm

We have several clients who are implementing LEED v4. While the changes in Fundamental and Enhanced...

Last reply: Scott Bowman, Mar 13, 2020, 12:45 pm

Need your Advise- Urgent (Sports Hall Project)

NC-2009 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Feb 11, 2016, 6:31 am

Hi,

We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities. Sometimes, it...

Last reply: Marcus Sheffer, Mar 7, 2016, 3:54 pm

Tankless Electrical Water Heaters

CS-2009 EAp2: Minimum Energy Performance
posted by Pedro Urazan on May 11, 2016, 10:51 am

Hi,

Do tankless Electrical water heaters have to comply with any efficiency requirements, in order to comply with the 7.4 mandatory provisions? On table 7.8 the performance requirements...

Last reply: , Jun 10, 2022, 10:53 am

Intelligent Glazing

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Peter Sushch on Jun 6, 2016, 3:57 pm

For the majority of our project we are using intelligent, electrochromic windows that automatically tint to maximize natural light. How should we go about calculating and documenting daylighting...

Last reply: Renee Azerbegi, Aug 30, 2016, 10:48 am

Does base building performance now impact CI performance?

CI-v4 EAp2: Minimum Energy Performance
posted by Kristopher Baker on Aug 23, 2016, 12:23 pm

It appears that there is a fairly major shift in the relationship between the tenant spaces within the project scope and the...

Last reply: Marcus Sheffer, Apr 13, 2018, 10:57 am

University Campus Project

NC-v4 LTc5: Access to quality transit
posted by Michele Helou on Oct 10, 2016, 2:58 pm

We have a university academic building with a weekday schedule M-F.
We had not planned to register as a Schools project but wonder if some of the Schools requirements for this credit might...

Last reply: emily reese moody, Apr 25, 2018, 2:11 pm

Daylight Analysis

NC-2009 IEQc8.1: Daylight and views - daylight
posted by SAMY Chamy on Jun 15, 2016, 8:03 am

Dear All

we have done daylight analysis for factory building.

we get daylight of 85% in 9 AM and 73 % in 3AM (Date -21 - September)

In this case which value we take to enter...

Last reply: GBD Architects, Sep 13, 2017, 12:18 pm