no space for 10 feet long walk-off mats in cafes
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adam Targowski on
Entryway walk-off systems at least 10 feet long will be installed in all regularly used entrances to the shopping mall we are working on.
tenant lease language
CS-2009 IEQp1:Minimum IAQ Performanceposted by Adam Targowski on
What has to be included in the tenant lease for the shopping mall spaces?
Compliance with ASHRAE 90.1 conflict with local norms
NC-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
In Bulgaria we have a project, which if using the Building Area Method of ASHRAE 90.1-2007 meets lighting requirements; however, using the Space by Space Method requires adjustments to be made to
EAp2 - Playground Field, Internal and External Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
Hi, On a Arena Sports stadium we are considering the "Building method Area" for the Interior Lighting.
Acoustic Ceiling Tiles
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Nanechka Pagan on
Does Acoustic Ceiling Tiles (composition: Mineral Wool) can be used as material to comply with this credit.
Existing Parking - Reuse Structural Slab
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nanechka Pagan on
The project that I am currently working have an existing structural floor slab (previously used as a parking lot; doesn't not have roof/walls), the current design intent is to maintain more than 6
Prelim Design Review
posted by Phil Meyer on
Is it possible to include a few construction credits in your LEED prelim design review submission?
LEED CI-project registartion after project completion?
posted by Adam Targowski on
Can an office get LEED CI certification if it is already renovated and occupied and it complied with all prerequisite requirements during renovation?
How to calculate / consider Elevators Energy consumption?
NC-2009 EAc1:Optimize Energy Performanceposted by Marcio Alberto Casado Pereira on
Is there any reference available to learn how to calculate and /or consider elevators energy consumption for both baseline and proposed models?
Adequate measurement equipment and procedures
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by CAIO DE MELO on
We are working on an office building with fan-coils units conditioning office spaces on typical floors and several multi-split ceiling cassette units conditioning technical occupied areas (maintena