Hi,
On a Arena Sports stadium we are considering the "Building method Area" for the Interior Lighting.
For the external lighting I am considering the Ashrae baseline and the project information for the proposed. (in W)
And for the Playground field I have the project LPD (W/m2) to input on the proposed building, but I don´t know how to consider it for the baseline.
Should I consider the same value of the proposed?
Thanks in advance.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
January 29, 2013 - 9:11 am
This lighting is exempt from 90.1 and is therefore considered a process or unregulated load. As such it needs to be identical to the proposed.