Forum quick links
"Less of Water" Term
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Abdulrahman Sherazy on
What does "less of water" mean? We have powder adhesive material for ceramic tiles. We sent it to the lab to determine the VOC content.
EAC1 Existing Building Renovation Baseline Rotations Required?
Schools-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
Is it required in the EAC1 energy model to perform the baseline building rotations of 90, 180 and 270º for an existing building that is being renovated provided the building footprint and exterior
Non-contiguous LEED boundary
NC-2009 PIf2:Project Summary Detailsposted by Todd Bundren on
I am working on a school renovation / addition project.
Minimum Recycling Area for residential building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by SUNG SU KIM on
Hi guys. We are pursuing LEED v2.2. Our project have five separate residential building. We will provide recycling area where each building entrance.
LEED Online and iPad
posted by Elizabeth Brodbeck on
Is it possible to access LEED Online from my iPad?
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
Mandatory provision 6.4.3.2 Setpoint Overlap Restriction When heating and cooling to a zone is controlled by separate thermostatic controls shall heating setpoint exceed cooling setpoint. In our C&
Exterior Walls and Ceiling Furred Out
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Sallyann Kluz on
We have an existing building that lacked insulation in exterior walls as well as the ceiling.
Hardscape
NC-2009 PIf2:Project Summary Detailsposted by Chris DeVolder on
Hi all, Thanks for the comments/feedback above. We have a small playing field/recreation field within our boundary adjacent to our building.
Manufacturing and Public Transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Andrew Sheridan on
We are working towards achieving this credit for a large manufacturing facility that runs 24 hours a day with 3 manufacturing shifts.
Feedback for ACP Program
Pilot-Credits EApc67:Energy Jumpstartposted by Elizabeth Crenshaw Hammitt on
Hi there LEED community, Our project team has just wrapped the performance period, and we are in the process of gathering documents and plan to submit our application in one week.