LEED CI 2009 : Project without HVAC change

General forums
posted by  Diana Hill  on 

We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.

0

Project without any HVAC change

NC-2009 PIf4:Schedule and Overview Documents
posted by  Diana Hill  on 

We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.

1
Mon Dec 31, 2012, 2:10 pm

LEED Online 3.0 form

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Noriko Nagazumi  on 

The IEQc7.2 Cooling Mode table asks for the Design Operative Temperature, Maximum Design Humidity and Design Air Speed for the four seasons (Spring, Summer, Fall, Winter).

1
Thu Dec 27, 2012, 7:07 pm

Hand drier

CI-2009 MRc4:Recycled Content
posted by  soha yamani  on 

hand drier installed in toilets : should it be included in materials ? if yes under which CSI division it is mentioned

1
Wed Jan 2, 2013, 3:14 pm

Wall Finishes

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Laurie Hammack  on 

We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials.

1
Wed Jan 9, 2013, 5:26 pm

Eligibility

NC-2009 PIf1:Minimum Program Requirements
posted by  PAWAN DAHIWAL  on 

I want to get LEED-EBOM certification for my book store (18,000 sq.ft) located on 3rd floor of total 12 floor building. can i eligible to get certification?

1
Thu Dec 27, 2012, 2:23 pm

System type for Retail space

NC-2009 EAp2:Minimum Energy Performance
posted by  Erika Duran  on 

I'm modeling a residential building with water to air heat pumps in all apartments.

1
Thu Dec 27, 2012, 9:39 pm

Two building connected by bridge.

General forums
posted by  Zonda E. Team  on 

The project involves two buildings, one is an office+workshop (50,000 sqf) and the second building is Dining area for the first building (7,000 sqf).

0

Occupancy values in ventilation calculations

Calculating FTEs
posted by  Daniel Padgett  on 

Hello, one of our review comments was that the occupancy values we reported in the ventilation calculations were inconsistent with those reported in other credits.

1
Tue Mar 19, 2013, 1:11 pm

LEED EBOM 2009 Performance Period / Fees - Resurrected Project

Performance Period
posted by  Randy Walsh  on 

Breathing new life into a comatose certification application already through preliminary review. Initial performance period 09/09/10 through 12/09/10. Application submitted 04/02/12. Preliminary r

1
Thu Mar 21, 2013, 5:07 pm