Forum quick links
LEED CI 2009 : Project without HVAC change
posted by Diana Hill on
We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.
Project without any HVAC change
NC-2009 PIf4:Schedule and Overview Documentsposted by Diana Hill on
We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.
LEED Online 3.0 form
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Noriko Nagazumi on
The IEQc7.2 Cooling Mode table asks for the Design Operative Temperature, Maximum Design Humidity and Design Air Speed for the four seasons (Spring, Summer, Fall, Winter).
Hand drier
CI-2009 MRc4:Recycled Contentposted by soha yamani on
hand drier installed in toilets : should it be included in materials ? if yes under which CSI division it is mentioned
Wall Finishes
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Laurie Hammack on
We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials.
Eligibility
NC-2009 PIf1:Minimum Program Requirementsposted by PAWAN DAHIWAL on
I want to get LEED-EBOM certification for my book store (18,000 sq.ft) located on 3rd floor of total 12 floor building. can i eligible to get certification?
System type for Retail space
NC-2009 EAp2:Minimum Energy Performanceposted by Erika Duran on
I'm modeling a residential building with water to air heat pumps in all apartments.
Two building connected by bridge.
posted by Zonda E. Team on
The project involves two buildings, one is an office+workshop (50,000 sqf) and the second building is Dining area for the first building (7,000 sqf).
Occupancy values in ventilation calculations
posted by Daniel Padgett on
Hello, one of our review comments was that the occupancy values we reported in the ventilation calculations were inconsistent with those reported in other credits.
LEED EBOM 2009 Performance Period / Fees - Resurrected Project
posted by Randy Walsh on
Breathing new life into a comatose certification application already through preliminary review. Initial performance period 09/09/10 through 12/09/10. Application submitted 04/02/12. Preliminary r