CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements

Wall Finishes

We have a project that is retaining most of the interior walls, but the walls are to receive new wall covering materials. The credit language, mentions "finished" walls, but does not mention wall coverings as it does floor coverings. Can we include a wall's area in our "Retained Components" if it is to receive new finishes?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 01/09/2013 - 17:26

Yes, this is what is meant by the credit language because it is about the non-structural wall as a component, despite whether you re-paint or refinish the wall. The floor coverings are the non-structural element of the floor, which is why they talk specifically about floor coverings as opposed to the sub floor. Hope this helps!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.