Forum quick links
Baseline System Selection - larger heated space - smaller cooled
NC-2009 EAp2:Minimum Energy Performanceposted by Don Carsto on
Our case involves 16,000 sqft of cooled and heated space and 90,000 sqft of heated-only space. The two spaces happen to be separated by a 4-hour fire wall.
ASHRAE 90.1 appendix G - VAV modelisation in baseline system 7
NC-2009 EAc1:Optimize Energy Performanceposted by Julien Daclin on
Hi, I have a question about the interpretation of section G3.1.3.13 (VAV minimum flow setpoints).
posts on original LEED-HC forum
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tristan Roberts on
For everyone's reference, there are a number of forum posts that were made to LEEDuser's general LE
posts on old forum
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQc8.2 question was posted. I am reposting the Q&A here for convenience:
post on old forum
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this MRc4.2 question was posted. I am reposting the Q&A here for convenience:
post on older LEED-HC forum
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this MRc5 question was posted. I am reposting the Q&A here for convenience:
here is another post from the older LEED-HC forum
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Tristan Roberts on
Q: In regards to the following statement, as part of the MRc4.2 requirements:
repost from older HC forum
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQp1 question was posted. I am reposting the Q&A here for convenience:
Projects boundaries in campus and LED site lights with OC sensor
posted by Saju Varghese on
We are currently having a campus containing 11 buildings/structures out of which, 6 are going to be LEED certified.
Too many densely occupied spaces
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Rubén M. R. on
Hello everyone, I am working on a three-level commercial office project.