certificate at the end of the site construction ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Nicolas MOLLE on
Hello, How does it run with this credit since the owner receives the Leed certificate after the end of the site construction and not one year after ?
Enhanced Cx EP
CS-2009 EAc3:Enhanced Commissioningposted by David Edenburn on
For exemplary performance for a CS project, we can commission the tenant spaces.
Required Signatory SSc5.2-1. Owner/Agent
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Aldo Pazo on
Hello everyone!! Could anyone explain what's required in point Upload SSc5.2-RS1?
DES -option2: virtual rate
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Gellrich on
Modeling a DES system after Option 2, we got the energy consumption and prices from the DES.
outdoor air rate for kitchens
CI-2009 IEQp1:Minimum IAQ Performanceposted by Adam Targowski on
I would like to ask if there's any requirement regarding outdoor air suplly to a kitchen located in an office area? In ASHRAE 62.1-2007 Table 6-1 a kitchen is not mentioned.
SHGC vs U-factor
CS-2009 EAc1:Optimize Energy Performanceposted by Alex AC on
Hi everybody! I´m looking at several glass options for a building project and I want to make sure I pick the most cost-effective and energy efficient options available to me.
LEED paperwork for EAp2: Seciton 1.2 - Space Summary
NC-2009 EAp2:Minimum Energy Performanceposted by Doug Cooper on
Does the LEED online form want me to list each space room by room, or are a few overall general space types okay?
Ceiling credit
CI-2009 IDc1:Innovation in Designposted by Tarek on
now we are working on project Commercial interior in Egypt ,As you know that there is no credit related to ceiling , 80% of building was used the false ceiling and this ceiling was Meets CA Dept.
CX EBOM EAc2.1
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Katherine Phelps on
Looking for a Building commissioning service provider in Southern Massachusetts.
Contract service use of equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Kay Sieck on
Do I need to get a list of the powered equipment used by our contract service that is used on site for landscape management such as lawn mowers and leaf blowers?