EA Prerquisite 2 compliance for International Project
CI-2009 EAp2:Minimum Energy Performanceposted by gustavo goldman on
Due to restrictions of the imports set by the National Government early this year, there are no HVAC systems
Proposed Design HVAC Capacities
NC-2009 EAp2:Minimum Energy Performanceposted by AshLee Eustace on
Should heating and cooling capacities for the proposed design be modeled the same as the baseline (15% and 25% over-sized) or should they be modeled with actual capacities? Thank you
Table G3.1 Design Model Requirement
NC-2009 EAc1:Optimize Energy Performanceposted by Omer Moltay on
Hi, We are modeling an office building in Moscow. There are large underground parking levels that are heated.
comingled = diverted on MRc2 form?
CI-2009 MRc2:Construction Waste Managementposted by Anna Barton, LEED AP BD+C on
The sentence right above the CI 2009 MRc2 chart clearly says: 'Documentation is required for commingled waste only' but this requirement also seems to apply to 'diverted' waste (by further defini
Water pressure 60psi for a single floor building??
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
Hi folks, This prerequisite says that the baseline water flow for lavotory and showerheads should be measured at 60psi and 80psi respectively.
ASHRAE Standard 55-2012 Comfort Model
CI-2009 IEQc7.1:Thermal Comfort—Designposted by John Kitsalis on
I am using the program above to document IEQc7.1 There is an option for me to calculate the MRT for an individual room. In the project I am working on, I have multiple rooms.
CO2 sensor alarm when conditions vary 10%
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Saju Varghese on
The credit template requires the CO2 sensors to be programmed to generate an alarm when the conditions vary by 10% or more from the design value.
Commissioning of plumbing fixtures when no hot water
NC-2009 EAc3:Enhanced Commissioningposted by Emmanuel Pauwels on
The review comments of the basic Commissioning of our project says the following " it appears that all systems included within the LEED-NC project scope of work have not been included.
MR Calculator incorrect?
CS-2009 MRc5:Regional Materialsposted by Reid Middlebrooks on
It appears that the BDC Material and Resource Calculator (July 2012) provided under the credit resources incorrectly calculates the Regional Material percentage.
Using Lease Agreement for Undesigned Elements
CS-2009 EAp2:Minimum Energy Performanceposted by Tony Schafer on
I am wondering if the tenant lease agreement can be used to specify undesigned elements for EAp2 similar to how it is used to achieve other credits.