Forum quick links
OPR Translation
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by LEED Pro Consultant on
I'm from Mexico and my client ask me to translate the 120 page OPR document from Spanish to English with the argument that USGBC will need it that way. The templates of this prerequisite and the c
FTE's for Convention Center
posted by Kay Sieck on
Has anyone calculated FTE's for a Convention Center. I have been working on this credit and am still not comfortable with my numbers.
Hotel
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nelina Loiselle on
To satisfy the LEED requirements, does every room in a hotel have to be commissioned?
purchasing of carpets
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Fatma Al-Fahad on
I need your advice regarding purchasing sustainable carpet that meets LEED requirement.
Roof or Non-roof?
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Katherine Ann Resurreccion on
Hi All, We are working on a high-rise office project that will sit on top of an existing structure.
Option 1 - Football Stadium and Bullfighting Ring
NC-2009 SSc2:Development Density and Community Connectivityposted by Alicia Villanueva on
We are trying to achieve this credit through option 1 documenting the buildings located within the 1/2 mile radius.
Are all carpet extractors considered equal?
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Kaeryn Gregory on
My client is a school board and they have recently purchased a dry carpet extraction machine and cleaning product program, the machine is not CRI certified.
IAQ requirement in LEED
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by gloria cheng on
I'm working on a certification of office building. I have been go through the requirement on IEQ, but I'm not sure if I missed. Did any requirement on measuring some IAQ parameter, for example, PM1
Performance Period over 1 1/2 years ago. Can we still submit?
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Sandie Sparks on
I currently was contacted by a building owner (Hotel) to finish up the LEED certification.
Buildings users with disabilities
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
Our project has entirely separated bathrooms for people with disabilities with flow and flush fixtures consumption different from the ones of the conventional bathjrooms. How can I estimate the pop