Forum quick links
Private Lav Faucets - Baseline vs. Metered Design
CI-2009 WEp1:Water use reductionposted by Vincent Pieri on
We are working on a single floor, single tenant project with several fixture group assignments.
multiple buildings energy modeling
NC-2009 EAp2:Minimum energy performanceposted by Tarek Dalati on
My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly
Deadline for project submission
posted by Peggy Brock on
Project deadlines are found in the Certification Policies Manual starting on page 16 and rating system specific deadlines are in the appendices starting on page 31.
Refrigerators
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Rebecca Nelson on
I want to be able to supply to LEED certified buildings and customers. To apply towards a LEED credit, do refrigerators and refrigerator-freezers only need to meet EnergyStar requirements?
Defining "One Building"
posted by Chris DeVolder on
I'm curious how others would interpret MRP 2 Must be a Complete Building or Space as it relates to an outdoor sports facility. The facility has a series of 'buildings' that are connected (some cont
New LEED CI SScr3
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Kevin Wilcox on
I recently completed a LEED CI project and submitting for review and just started a new LEED CI project under LEED CI v2009 and found a significant change to the SS credit 3 category.
9.4.1.2 (Space Control)
NC-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.
We are working on a stadium
NC-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
We are working on a stadium Project, where the item 9.4.1.1 (Automatic Lighting Shutoff) of ASHRAE 90.1-2007 is being complied for most of the areas, which represents more than 90% of the project a
Acceptable Testing Evidence?
Pilot-Credits EApc8:Demand responseposted by Terry Gorski on
What type of evidence of Demand Response testing being conducted would be acceptable to submit for a building that has 3rd party systems involved and does not receive any documentation of the actua
Define "Weatherproofing System"
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Steven Woods on
The roof on our building is constructed as follows: structural steel framing, metal roof deck, vapor barrier, rigid insulation, ventilated nail base insulation panel (a pre-fabricated unit of OSB o