My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly I rather to get rid of them to increase my LEEd points.
MY question is can I disregard them from all LEED points ( here EAP2 energy simulation) even if they are fed from the same heating and cooling system which feed the tower?