Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Cutsheet Translation

CS-2009 WEp1:Water Use Reduction
posted by  Alessio Zampaglione  on 

Our project is In Italy and most of the cutsheets, certifications and declarations that we have are written in Italian and not in English.

1
Sun Sep 2, 2012, 2:07 pm

Landfill Generated Methane Gas

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kendal Neitzke  on 

Our building project is a methane pumping facility located at landfill that is the source of the methane.

1
Thu May 3, 2012, 3:55 pm

Hot Melt Adhesives

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Bruce Maine  on 

I thought I knew the answer to this question but can't confirm. Are Hot Melt adhesives used in the application of laminates covered by the 80 g/L threshold? Thanks!

1
Tue Jul 17, 2012, 7:59 pm

MRc7

CI-2009 MRc7:Certified Wood
posted by  Judy Chin  on 

Pyro-Guard Plywood (fired treated). How should i document this for MRc7? My co-worker says 100% for new wood & 0% for FSC, is this correct?

1
Tue May 8, 2012, 11:06 pm

Combining Pathways

Pilot-Credits PC43:Certified Products
posted by  Ben Tucker  on 

It is my understanding from the credit language that you can combine multipliers from the Certification pathway and the EPD pathway which is what we would like to do for our project.

1
Mon May 7, 2012, 10:23 pm

Unsure if LEED form is behaving correctly

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Johanna Ofner  on 

My project is pursuing Option 1, stormwater assessment report, of the Full documentation option of the O&M submittal path (what a mouthful!) of SSc6.

1
Tue May 8, 2012, 11:27 pm

LEED NC vs. Healthcare

LEED for Healthcare forum
posted by  Lisa Sawin  on 

Our project is mostly office space but houses a program for mental health.

1
Tue May 8, 2012, 12:42 pm

Where do special review requirements come from?

General forums
posted by  Hernando Miranda  on 

I have documented LEED projects since the dawn of time. Well, at least since the first certified NC v2 project that was not a special test case: Ford Premier Automotive Group NA vs.

0

LEED HC Submission Portal

LEED for Healthcare forum
posted by  Joshua ADY  on 

We have a Hospital Project that is ready for design submission and wanted to reconfirm if LEED HC design phase submission could be made on USGBC Portal.

1
Tue May 29, 2012, 6:05 pm

Maximum angle of incidence?

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Jamie Brown  on 

This question is a little difficult to describe in writing- is there a maximum angle of incidence from perimeter glazing for a “direct line of sight?” If you are directly in front of the window lo

1
Tue May 8, 2012, 11:28 pm