Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Performance period before project registration?

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Jorng-ren Chern  on 

My client is an electronic product manufacturer and their corporation headquarter is planning to pursuit LEED EBOM certification.

1
Thu Apr 26, 2012, 2:14 pm

MockUp ID Credit

NC-2009 IDc1:Innovation in Design
posted by  Dan Forino  on 

Has anyone attempted the MockUp ID credit for a Commercial (instead of Residential) project?

1
Thu May 3, 2012, 8:01 pm

Design Application Decision - 1 Denied Credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Joseph Greene  on 

We received our design application decision and 1 credit was denied. We noticed this was due to a simple documentation error which can be easily corrected.

1
Thu Apr 26, 2012, 3:24 pm

Prerequisite Post Appeal Denial Options

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  John Chyz  on 

Our project team erroneously missed a small outside air louver that was within the 25 ft. threshold for designated smoking areas.

1
Mon Apr 30, 2012, 4:23 pm

LEED online access and compatability

leedonline.com access - is it possible???
posted by  Sherri von Wolfe  on 

Hello, We are currently working on two LEED projects utilizing the Safari platform. Recently, I had trouble with uploads on NC 2009 SSc5.2 (v03).

0

Corrective Action - Sound Privacy

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  AshLee Eustace  on 

We just completed the occupant survey, and the results are showing that many of the occupants are dissatisifed with the sound privacy.

1
Tue Sep 4, 2012, 5:24 pm

RE: IEQ.p1- 62 MZ-ASHRAE Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Bobby Ghataura  on 

I have a 3 story non-residential building, and VAV's on each floor are served by individual air handling units.

1
Thu Apr 26, 2012, 6:38 pm

Walking closets?

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Agustina Galli  on 

Hi everyone! we are building a Hotel and Residences and are willing to certify as New Construction.

1
Fri Apr 27, 2012, 11:56 am

Using MR Cr 5 as an ID point for LEED-NC v2.2

LEED for Healthcare forum
posted by  emily reese moody  on 

We are currently evaluating attempting MR Cr 5 from the Healthcare track for use as an ID point under LEED v2.2.

1
Thu Apr 26, 2012, 9:14 pm

COP - Future tenants - Energy Efficiency Simulation

CS-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.

1
Fri Apr 27, 2012, 2:52 pm