Bio-based building materials - foam for use under concrete
NC-2009 MRc6:Rapidly Renewable Materialsposted by Charles Fritzemeier on
I have a project for which we are pursuing Platinum and have an opportunity to use a bio-based material (12"+/-) as a filler under pan deck and concrete.
Baseline Percent against what?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Rory Cousino on
Please excuse my ignorance on this, but when determining the baseline to compare, I understand that it depends on the substantial completion date of the plumbing system and if before 1993, then use
Under Construction
NC-2009 SSc2:Development Density and Community Connectivityposted by Lawrence Lile on
I am on a block with two other project under construction at the same time. Can I count the other projects in my calculation of development density?
NC v2009 EAc6 and ID credit
NC-2009 EAc6:Green powerposted by Sheryl Swartzle on
The owner purchase 99% green power in error (70% was to be purchased).
LEED EB:OM SS c 4: No Transport Survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Srimannarayana NCVK on
Hi All, We are working for a facility wherein the occupants commute by company buses everyday. Approximately 95% of the occupants use company buspools.
Energy model boundaries
CS-2009 EAc1:Optimize Energy Performanceposted by Julien Daclin on
My question is currently about the scope of certification, but has it main impact on the building's energy performance. We are currently working on a major renovation and extension of an office bu
electronic air filters
EBOM-2009 IEQc1.4:IAQ Best Management Practices—Reduce Particulates in Air Distributionposted by Iris Amdur on
Have any projects used electronic air filters (in conjunction with MERV 8 filters) as an alternative compliance path for this credit?
Heat pumps
Schools-2009 IEQc10:Mold Preventionposted by Nate Maniktala on
Do we need humidity control on every single heat pump that is in the builidng?
Rheem Hot Water Heaters
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Elizabeth Powers on
I am trying to determine if we need to include the conventional commercial gas/electric water heater in our Energy Star documentation.
Demand Charge & 25% Procsee Cost
NC-2009 EAp2:Minimum Energy Performanceposted by Joey Jiao on
Hi, everyone, If there is a project with demand charge, how should we deal with the rule of 25% process cost. Assume one building annual cost like below: total demand cost(by $/kw)=1$ total energy