Forum quick links
Any change on accepting CARB phase II ?
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Susan Di Giulio on
I have been having an ongoing back and forth with a bamboo plywood and flooring distributor about a few products that they import form China.
7 Working days
posted by Diaa Madkour on
Hi all, We are working on a call-center office building. The employees will be working 7 days a week. with 3 shifts a day. We have a confusion with calculating the FTE.
Open-grid paving
NC-2009 WEc1:Water Efficient Landscapingposted by Paula Rantanen on
Does anyone know if open-grid paving is qualified as vegetated area?
FTEs or Residents for Mixed-use residential project?
posted by Joel Cesare on
Our project is 4 floors: first floor with three commercial tenants and top 3 residential. The occupant numbers for the residential is straight-forward based on LEED default values.
Parking in basement
posted by Aldo Pazo on
Good morning, We are working on a 22 story office project. The building has also 3 stories below grade that mixed parking (250 parking spaces) and other uses (Auditorium, etc.).
Concrete Recycling
NC-2009 MRc2:Construction Waste Managementposted by matthew convery on
Well I've read through the current posts and can't find the following discussed: We have a good amount of clean concrete and CMU we've demolished off an addition, we intend to use as much of the
Near Airfield
NC-2009 IDc1:Innovation in Designposted by David Menk on
Our project is located across the street from a military airfield.
"Stub-outs" and future development (NPDc6)
posted by Eric Orozco on
Greetings all, My project is surrounded by adjacent development/redevelopment opportunities - all of which will in time be redeveloped to connect to our street and pedestrian grid, but probably n
Increase in Fundamental Scope...
posted by Scott Bowman on
From my reading of the Fundamental Commissioning credit, it now includes a peer review (but with very little detail) and a Peer Review (Current Facilities Requirements and Operations and Maintenanc
Commissioning of Systems not required in prereq
NC-2009 IDc1:Innovation in Designposted by Shauna Sproul on
I am wondering if Innovation & Design Credits can be earned for commissioning systems that are not in the prerequesite, for example the building envelope? I know credits can be earned in 2012 u