Forum quick links
Energy Modeling with California T24-2008
NC-2009 EAc1:Optimize Energy Performanceposted by eileen hughes on
Will the GBCI accept the model if it is completed based on Title 24 -2008 energy standard in lieu of the T24-2005 or ASHRAE 90.1-2007?
Flexibility
NC-2009 IDc1:Innovation in Designposted by Denise Newbould on
Is it okay to pursue more than one path to obtain ID credits?
Required Signatory IEQp2-1 form?
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joel Register on
On the form for this credit, there is an option to upload IEQp2-RS1.
How to define the "project's energy-related systems"?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Andrew Gil on
I am seeking clarity on this point given the GCBI's June 2011 update of MPRs and the current emphasis on defining a project "in it's entirety".
IEQc4.2
posted by Tristan Roberts on
Anatoly, please see the requiements and discussion under IEQc4.2—I think that's where this would fall.
Existing System with New Chiller Plant
NC-2009 EAp2:Minimum Energy Performanceposted by Ante Vulin on
Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.
Walk-off mat system - Stone panels with a recess below.
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by myriam tschiptschin on
The project team of an office building is interested in using a new product called C/S Floorometry® 401 for the walk off mat: http: //www.c-sgroup.com/files/literature/Floorometry_0.pdf This is a f
LEED CS ID Path 1 - Legally binding performance criteria
CS-2009 IDc1:Innovation in Designposted by Caroline Ma on
In our CS project, we would like to develop a legally binding performance criteria for the tenant to attempt 1 point in ID Path 1.
Treatment of District or Campus Thermal Energy and EAp2-7 tables
NC-2009 EAp2:Minimum Energy Performanceposted by AAME User on
Our project involves the new construction of a healthcare clinic that is being heated and cooled via heating and chilled water produced by a campus central plant.
How to determine the building foorprint?
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Gabriela Hernández Castillo on
Our project is a building that literally crosses another building. It consists of a 40 stories building (the LEED building) that comes out of a 3 stories mall (not applying for certification.