CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems

How to define the "project's energy-related systems"?

I am seeking clarity on this point given the GCBI's June 2011 update of MPRs and the current emphasis on defining a project "in it's entirety". Understanding the requirement to commission every energy-related system that serves the tenant's space starting from the point of origin for that tenant space is relatively straightforward in theory; it's the practice that has me nervous. Unless a wholely independant system, or sub-systems are used, how far *back* will one have to go (i.e. what of base building system heat pumps and Air Handlers with individual VAV boxes in the tenant space): do the HPs and AHUs that ultimatey serve the tenant space have to be commissioned? This is a relatively small tenant in a very large development, and the cost of commissioning could make this an impossible venture (sad, given that the tenant is a nonprofit that promotes and funds various sustainable enterprizes). As always, big thanks to LEEDuser for being there!

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 07/05/2012 - 15:01

Andrew, sorry for the slow response here! Have you figured out this question?My understanding is that if the tenant work is altering base systems, then those need to be commissioned as being in project scope, but if just plugging into them, you only have to commission the equipment that you're adding.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.