Forum quick links
high-rise residential building
posted by Adam Targowski on
Can a high-rise residential building be certified under LEED Core&Shell? If yes, what is the minimum amout of stories that the building should have (4 or 7)?
LEED HC WEc4.1 - Vacuum Pumps
posted by Simon Sue on
A very specific medical equipment in our project building uses oil-sealed rotary vacuum pump as primary pump and dry vacuum pump as secondary pump.
Occupancy Fitness Center
CS-2009 WEp1:Water Use Reductionposted by Ralf Lehmann on
Has anyone of experience in including a fitness center m to an office building. One of the tenants of our Project will be a fittness center. All fit outs will be done by the tenants.
Non-fibrated aluminum paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Bruce Maine on
This is actually a LEED for Healthcare question dealing with exterior applied products. In several roofing sections we ask for "non-fibrated aluminum paint".
Office Space With 25% Data Center Changing to 100% Office-June
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Michelle Bracewell-Musson on
There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center.
Recycling Areas Designation
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Sunayana Jain on
In the floor plan, is it required to document the recycling areas as paper, corrugated cardboard, glass, plastics and metals specifically or just designating as recycled areas in floor plan will be
Recertify- post 5 years?
posted by Chris Munn on
According to the guidance I've seen from LEED, your performance period for recertification is from the time you were certified initially up until the time you submit for for recertification.
Entering "total project space equipment capacity" - LEED form
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Seema Pandya on
In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks for
Paint and coating - underground car park and technical platroom
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Julien Daclin on
Does this credit also apply to paint and coatings located in an underground car park and technical plantrooms?
Commercial Building with Tenant spaces fully submetered
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Energy Spectrum on
I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit.