Forum quick links
Material and Product certifications in LEED EBOM
posted by Susann Geithner on
I have received a couple of emails and inquiries from especially European project teams in regards to the standards referenced in LEED EBOM for Green Cleaning. So here is the current situation.
90.1-2007 Table G3.1.1A for Additions and Alterations
NC-2009 EAp2:Minimum Energy Performanceposted by Evelyn Dicks, EI, CxA on
Do the requirements of Table G3.1.1A Baseline HVAC System Types apply to the whole building or just to the project area for additions and alterations?
Furniture Used from Previous Location in New Site
CI-2009 MRc4:Recycled Contentposted by Michelle Bracewell-Musson on
First of all, I LOVE this site as it is so helpful and has saved me so much time! THE ISSUES I have documented the reused furniture in MR c3.2 Materials Reuse - Furniture and Furnishings and I know
Exemplary Performance in Stage 1
posted by Daniel Costantino on
Hello, I am working on Stage 1 submittal templates and have noticed that some templates for credits which offer exemplary performance per the reference guide (e.g.
"Gross square footage undergoing initial fit-out"
posted by Sue Barnett on
what's the difference between "Gross square footage undergoing initial fit-out" vs "Gross square footage undergoing alteration"?
ABSL-3 Baseline vs. Proposed Fan Energy for RTU
NC-2009 EAc1:Optimize Energy Performanceposted by Michael O'Brien on
I've recently come across a deblitating problem as it pertains to the energy modeling of an ABSL-3 space.
IAQ Concerns due to LEED boundary
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Kunjan Shah on
My project is inside a 3 story building. The remodel work spans all 3 floors and City permit drawings show work all over the building and building shell.
CIR for process condition that allows exclusion of space?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by CRB Sustainability on
Hi, For a building that has a specific requirements for manufacturing areas to be at temperature/humidity setpoints that fall outside of ASHRAE 55-2004 is there a CIR that anyone else has found th
My team and I have reduced
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Alicia Villanueva on
My team and I have reduced water use in a project through dual flush fixtures, low flow urinals, low flow lavatories and low flow shower heads by more than 25%.
Recycled Content Range
CI-2009 MRc4:Recycled Contentposted by Jennifer Berthelot-Jelovic on
What does USGBC/GBCI accept when you have a range of recycled content. For example, Sika/Sarnafil has a 5-10% Post consumer recycled content on one of their projects in their documentation.